You are here:Home » Product » Alkaline Water Treatment Plant Manufacturer From King Machine
Alkaline Water Treatment Plant Manufacturer From King Machine
Alkaline Water Treatment Plant Manufacturer From King Machine
Alkaline Water Treatment Plant Manufacturer From King Machine
Alkaline Water Treatment Plant Manufacturer From King Machine
Alkaline Water Treatment Plant Manufacturer From King Machine
Alkaline Water Treatment Plant Manufacturer From King Machine
Alkaline Water Treatment Plant Manufacturer From King Machine
Alkaline Water Treatment Plant Manufacturer From King Machine
Alkaline Water Treatment Plant Manufacturer From King Machine
Alkaline Water Treatment Plant Manufacturer From King Machine

Alkaline Water Treatment Plant Manufacturer From King MachineAlkaline Water Treatment Plant Manufacturer From King Machine

Quantity:
Share this:
  • Brand: KM
  • Code: 8421219990
  • Product Description
  • Video
  • FAQ

Porduct name:Alkaline Water Treatment Plant

1. High speed shred tank
•Capacity: 2ton/Hour
•Mixing time: 10-20minutes

2. Water ionizer
1. Customer requirement
•Capacity: 3 ton/Hour
•PH: 9.5

2. Raw water requirement
•Raw water flow: 6ton/Hour
•Raw water PH: ≥6.5
•Raw water conductivity: 80~240us/cm

Protecting filter
Filter impurities exceeding 0.22/0.45 microns in water. Prevent other impurities in the middle tank or pipe from damaging the electrolytic water generator.

EW3A2496.jpgEW3A2498.jpgEW3A2499.jpgEW3A2501.jpgEW3A2506.jpgEW3A2508.jpg

Q:How about the spare parts?
A:We
will send one year enough easy broken spare parts together with the
machines,shipping together.During the warranty time,we will supply the
spare parts with our cost including the delivery fees.
          
Q:How long time for installation?
A:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
          
Q:How to install my machines when it arrives?how much the cost?
A:We
will send our engineers to your factory to install the machines and
train your staff how to operate the machines.Customer pay air tickets go
and back,accommodation and USD80/day/person.
          
Q:When can I get my machine after I paid?
A:Normally
production time is around 30-60days,the exactly depend on what kind of
machine you order.The shipping time is based on your destination port.
          
Q:What’s your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 1 year guarantee and supply life-long technical support.
          
Q:Are you a trading company or a manufacturer?
A:We
are an Original Equipment Manufacturer so that we can provide you high
quality machines in raeasonable price, Welcome to visit us.